– Compile a failure list for each and every step. – Measure failure impacts. – Determine failure rates. – Establish probability of discovering errors.
– When a module is being designed or redesigned following a quality function development. – When an existing module is being applied in a new eco-system. – Before the development of control plans for a new or modified process. – When planning improvement goals for an existing module. – When assessing a failure in an existing module. – To periodically assess a module.
FMEA should be used: